Biological air washer incorporated in pighouse

To save space a complete air scrubber was built in into the pighouse on top of the central walkway.  The roof passage was developed by CBgroep technicians and welded in waterproof plastic panels.  From the central exhaust pipe above the pigs, the roof passage is accessible via a secure ladder.  The centralized control room is placed on the ground and serves the additional air scrubbers on the farm.